Features
24v 100ah marine battery for travel trailer Motor Cycle Solar Storage Golf Cart
Drop-in replacement for lead-acid batteries (plug and play)
100% depth of discharge (DOD) for consistent, reliable power output
Flexible size design subject to different spaces of the application
Parameters
24v 100ah marine battery for travel trailer Motor Cycle Solar Storage Golf Cart | |
| Brand | Manly |
| Model | MLP24100A |
| Electrical Characteristics | |
| Voltage | 25.6V*8S |
| Rated Capacity | 100Ah |
| Energy(Watt-Hours) | 2560Wh |
| Recharge Cycles@0.2C | >3500 Times |
| Self-Discharge | < 2% per month |
| Design Life | 15 Years |
| Guaranty | 36 Months |
| Standard Charging | |
| Charge Voltage | 29.2V |
| Standard Charge Method | CC/CV |
| Recommend Charge Current | 0.2C~0.5C |
Max Charge Current | 1C |
| Standard Discharging | |
| Constant Working Current | 1C |
| Pulse Discharing Current | 3C(<3s) |
| End of Voltage | 20.0V |
| Structure | |
| Positive plug | M8/Optional |
| Negative plug | M8/Optional |
| Communication Port | Optional |
| BMS Protection function | Overcharge and discharge protection, overcurrent and short circuit protection |
| Enclosure IP Rate | IP65 |
| Enclosure Material | Black ABS |
| Product Size(L*W*H) | Customzied |
LiFePO4 VS Lead Acid Battery:

Customized Services: Feel Free share your requirement to MANLY Battery at sales@manlybatteries.
com.
Applications for 24V 100Ah:

Why Choose MANLY Battery?
Quick response within 24 hours, 7/24 service, US$1,000,00 Product Liability Insurance by CPIC. Complete after-sales policy and team deployment allow you to enjoy products without worries.
All of our LiFePo4 cells are grade A from our own factory's production bases, you can come here and visit our factory, we promise never to use grade B or C. Meanwhile, all other brand cells are optional if you need (Korean and Japanese brand cells)
If customers need, we usually choose a metal casing charge with a built-in cooling fan, which is better and safe ensure the charge is safe and circle lif of the battery
MANLY Battery Factory Overview



Customers Feedbacks

FAQ
Q: What about the lead time?
A: New design sample needs 25-30 working days, neutral order mass production time needs 15-20 working days. If OEM orders, would be about 20-25days.
Q: How do you ship the goods and how long does it take to arrive?
A: DHL, UPS, FedEx or TNT for samples. For mass order, you can choose Sea or Air shipment.
Q: Can we visit the MANLY factory?
A: Warmly welcome. Our factory is located in Shenzhen, very close to Guangzhou or Hongkong.
Q: What about the lead time?
A: Sample needs 3 to 4 weeks , mass production time needs 2 ~3 weeks.
Hot Tags: marine battery for travel trailer, manufacturers, suppliers, factory, customized, wholesale, buy, price, in stock, made in China












