1) Distinguish the system voltage


The system voltage is directly determined by the light source, if the light source is 12V, then the whole system is 12V system, if the light source is 24V then the whole system is 24V. Usually the light source packaging will indicate the light source voltage. If the package is not marked, please contact us immediately.


2) Cable cutting, stripping and wiring


Distinguish between panel line and light source line

R26;  The panel wire is black sheath wire

R26;  The light source line is red sheath line

Amount of wire cutting

Solar panel cable length = pole height + 1M

Cable length of light source = Height of light source + Arm length


3) the stripping

Strip the cables of the light source, battery and solar panel respectively.

Wrap the positive + and negative - terminals of the battery and solar panel cables with insulation tape to prevent short circuits


4) Wiring: Connect the light source cable with the light source and bind it tightly with insulation tape