What is the installation procedure of the battery tester during the production of energy storage battery?
1、Determine the installation location of the equipment;
2, confirm the order of battery placement, according to the order of the battery to determine the sampling line;
3, unclog the sampling line, clean up the obstacles in the line, fix the line groove or digging the trench;
4、Fix the cable plug on the equipment according to the corresponding order;
5、In accordance with the battery order and line arrangement, the sampling cable is led to the corresponding battery;
6、The total voltage sampling cable of the battery pack is connected to the positive and negative terminals of the battery pack;
7, connect the battery and isolation resistor, isolation resistor and cable, so that the battery access to the device collection module;
8, energy storage battery manufacturer to use anti-corrosion plastic tape will have a common direction of the cable wrapped;
9, determine the current sensor installation location;
10, the current sampling cable in accordance with the appropriate channel, from the equipment to the sensor, connected firmly;
11, determine the temperature measurement point of the equipment, the temperature sensor in accordance with the appropriate channel from the equipment to the temperature measurement point;
12、After all sampling cables are fixed according to their respective channels, check whether the cables and batteries and collection devices are connected well;
13、If the connection has errors or is not firmly connected, reconnect until all connection points are correct;
14、In the use of the cable channel or trench, put the wrapped cable into the cable channel or trench, and encapsulate it.