What is the installation procedure of battery tester for energy storage battery manufacturer

What is the installation procedure of the battery tester during the production of energy storage battery?


1、Determine the installation location of the equipment;


2, confirm the order of battery placement, according to the order of the battery to determine the sampling line;


3, unclog the sampling line, clean up the obstacles in the line, fix the line groove or digging the trench;


4、Fix the cable plug on the equipment according to the corresponding order;


5、In accordance with the battery order and line arrangement, the sampling cable is led to the corresponding battery;


6、The total voltage sampling cable of the battery pack is connected to the positive and negative terminals of the battery pack;


7, connect the battery and isolation resistor, isolation resistor and cable, so that the battery access to the device collection module;


8, energy storage battery manufacturer to use anti-corrosion plastic tape will have a common direction of the cable wrapped;


9, determine the current sensor installation location;


10, the current sampling cable in accordance with the appropriate channel, from the equipment to the sensor, connected firmly;


11, determine the temperature measurement point of the equipment, the temperature sensor in accordance with the appropriate channel from the equipment to the temperature measurement point;


12、After all sampling cables are fixed according to their respective channels, check whether the cables and batteries and collection devices are connected well;


13、If the connection has errors or is not firmly connected, reconnect until all connection points are correct;


14、In the use of the cable channel or trench, put the wrapped cable into the cable channel or trench, and encapsulate it.